Currencies

Coating Machine/Color Coating Line for Metal Structure

$2.00

 $1.00
Save: 50% off
QTY
.

Color coating line energy media and consumption1.Water quality requirements and technical characteristics1)Desalination water: Quality: Conductivity:≤10us/cm PH:6.5-7Hardness:≤0.03mmol/L Oil content:≤2mmol/LSuspended matter:≤5mg/LQressure:0.5-0.6MPa Flow:3T/h2)Recycled water: Quality: Hardness(Ca Mg):≤16dh PH:6.0-8.7Suspended matter:≤20mg/LQressure:0.4-0.5MPa Flow:50T/h3)Degreasing section sewage discharge: Quality: Alkaline and oily wastewater PH:9.0-13Qressure:0.4MPa Qressure:2T/dEmissions system: interval emissions. about 5T/time. 1 time/3 days2.Paint consumption:Coating fluid consumption:0.15Kg/T;Primer thickness:8umConsumption is :21g/M2Back paint thickness :10umConsumption is:26g/M2Thick paint :17Consumption is:45g/M2.3.Natural gasCalorific value: 8500Kcal/Nm3Maximum consumption:300Nm3/hWorking pressure:10-20KPaUse system: ContinuousOperating temperature: Normal temperatureNormal production consumption:≤ 5Nm3/t(Consumption per ton of steel)4.Steam: This line does not use steam.5.ElectricityHigh pressure: 10kV/2.5%/ 5% Low pressure: 400 VFrequency: 50 HzTransformer capacity:630KVAPower consumption during normal production:50Kwh/t(Electricity consumption per ton of steel)6.StaffingThe production workshop has three shifts and the management department has one shift. 8 hours of work per class. 24 hours of continuous operation.7.Unit and plant and layout requirementsThe unit is located in the workshop with a span of 18m. a rail surface elevation of 10.5m. and a workshop length of approximately 160m. The workshop has two spans. one of which is a raw material span and a final product span
WhatsApp Online Chat !